studio point253

design inspired by you

House W2 – UNDER CONSTRUCTION

Conversion of an existing detached garage and attached garage and addition into a master suite with kitchen, and a natatorium.

Basic rendering of exterior.

Basic rendering of exterior.

 

Overview capturing the new carport, Natatorium renovation, and spa connection. Photo by Owner.

Overview capturing the new carport, Natatorium renovation, and spa connection. Photo by Owner.

IMG_0855

Looking through the connection which houses the spa and shower. Photo by Owner.

IMG_0854

Standing in the new Master Suite Living Room looking at the new Kitchen. Photo by Owner.

IMG_0849

Looking through the Natatorium to the new connection and Master Suite before construction of cathedral ceiling. Photo by Owner.

IMG_0838

An overview of the renovation and addition with a peek-a-boo view of the water. Photo by Owner.

 

 

3D View 6

Looking through the Natatorium to the new connection and Master Suite.

Docs Kitchen

Standing in the new Master Suite Living Room looking at the new Kitchen.

Docs LR

Living Room view.

C:UsersUserDocumentsPoint 2532014-05 Williams Connection_R

Floor plan of renovation and addition.

%d bloggers like this: